Tailings pond construction, management and environmental protection
We have completed two tailings ponds which has been designed, constructed, operated under the standards required by the law. Also we have completed the closure and post-maintenance monitoring, and accumulated a lot of experience in the entire process.
The mine has built waste rock yards and tailings pond as required, with a solid waste disposal rate of 100%. All the mineral processing wastewater, leaching water and downhole water gushing are treated in the wastewater treatment station, and the mine water disposal rate is up to 100%.